Home> > Sectors > East West Corridor Project in the State of Gujarat
East West Corridor Project in the State of Gujarat

JOB NAME
Consultancy Services for Construction Supervision of  existing 2–lane road to 4-lane of 3 Packages: Package-IV, Garamore – Samakhiyali and SamakhiyaliGagodhar Road Section of NH-8A and NH-15 (Length 90.3 km); Package-V, Gagodhar to Radhanpur Section of NH-15 (length 106.2 km); and Package-VI, Radhanpur – Deesa Section of NH-14 (Length 85.4 km); East West Corridor Project, ADB Funded (Loan No. 1944 –IND) in the State of Gujarat
Bridge Length-1262.9m
Bridge Length-558.30m


AGENCY
National Highways Authority of India

CLIENT
National Highways Authority of India

PERIOD
Jun. 2005 to April 2014

Length of Projects
282.9 Kms.

Present Status of Assignment
Completed